PHASE 3 : OPERA THEATRE

The theatre grounds with the Opera Stage was presented to the Temple by Mr.Tan Jiak Kim,
the son of Mr.Tan Beng Swee.The restoration of the opera theatre building, sited across the
road from the main temple gate, would be the last building to be restored. The Standing Committee
hopes to raise the funds for this last phase.

The temple complex is ideal for showcasing Chinese culture, art, and craftsmanship. This includes
works by artisans and craftsmen from China who have demonstrated outstanding skills in carving,
lime plasterwork, painting, chien nien, gold gilding, calligraphy, and drawing.